Galvanised mobile scaffold tower with braked castors, its four outriggers set on the ground with adjustable jacks
Choosing a mobile working tower correctly and using it safely: what the code in the standard means, the rules for moving it, stability and inspection, with sources.

01What Is a Mobile Scaffold Tower and How Does It Differ from Facade Scaffolding?

A mobile scaffold tower is a working tower standing on four castors. It stays upright on its own base without being tied to the building, and when the job is done it is pushed to the next position without being dismantled. Turkish regulations call it a "mobile access and working tower". We manufacture two types in our factory: the ringlock Ringscaff-M and the H-frame Safescaff-M. All components of both are hot-dip galvanised steel.

Facade scaffolding rises with the building, is anchored to the structure and stays in place for months. A mobile tower, by contrast, consists of a single bay and takes its stability only from its own base dimensions, its castors and its outriggers. The European standard EN 1004-1 describes the tower in the same way: a free-standing temporary structure made of prefabricated components, with dimensions fixed by design, four castors and one or more platforms.

Having no anchors makes a mobile tower fast to use, but it also sets the rules of use. Article 36 in Annex 4 (B) of the Turkish Regulation on Occupational Health and Safety in Construction Work, as amended on 31.12.2018, sets three conditions: the tower is not moved while someone is working on it; the equipment is kept plumb and the platform level; and the legs are fitted with a brake lever or similar device that prevents the tower from moving by itself. The following sections explain what these three sentences mean on site.

12.00 mhighest platform indoors
8.00 mhighest platform outdoors
2.00 kN/m²platform load (load class 3)
600 kgminimum capacity of each castor

02How to Read the EN 1004 Code

As with facade scaffolding, the standard sums up the properties of a mobile tower in a one-line code. Under EN 1004-1 the code is made up of four items: the load class, the maximum height outdoors and indoors, the access classes and the clear height class between platforms. In the TS EN 1004 certificate of conformity we hold from TSE for our mobile towers, the H-frame towers appear with this short designation: TS EN 1004 - 3 - 8/12 - XXCD.

CodeMeaning
3Load class 3: a uniformly distributed load of 2.00 kN (about 200 kg) on every square metre of platform. The other option in the standard is class 2 (1.50 kN/m²).
8/12Highest platform: 8 m outdoors, 12 m indoors. The height is measured from the ground to the top surface of the highest platform.
X X C DThe four means of access are written in order, with an X in place of any means the tower does not have. In our certificate C is an inclined ladder and D is a vertical ladder.
H2Clear height class: at least 1.90 m of free height between platforms (on a separate line in the certificate).

The access letters correspond to the four means defined in the standard. A stairway is designed for a person carrying tools or materials; a stair ladder, an inclined ladder (between 60° and 75°) and a vertical ladder are for a person climbing empty-handed. Two Xs in the first places of the code tell you that there is no stairway inside the tower and that climbing is done by ladder. In the same certificate our ringlock models appear with the code XXCX: on these towers access is by inclined ladder only.

Inclined ladder inside a ringlock mobile tower running from the lower platform to the upper platform, braked castors
A ringlock tower during erection: toe boards and outriggers are not yet fitted. The inclined ladder inside is the C in the code.
The scope of our certificate covers the H-frame ISKAMOD H70 and H105 and the ringlock ISKAMOD F70, F105 and F134 models; working area length 2.50 m, widths 0.70 / 1.05 / 1.345 m. The standard was revised in 2020 as EN 1004-1; the four parts of the code are the same in the new edition. How to read the similar code for facade scaffolding is explained on the Safescaff Detailed Information page.

Get a quote for your project