Skip to content
İSKA CAD - 3D scaffolding design

Mobile Scaffold Tower

Mobile Scaffold Tower
Mobile Scaffold Tower - photo 1 Mobile Scaffold Tower - photo 2 Mobile Scaffold Tower - photo 3 Mobile Scaffold Tower - photo 4 Mobile Scaffold Tower - photo 5

Click a photo to enlarge it.

Available for rent, with erection, dismantling and transport →

Ringscaff-M / Safescaff-M Mobile Scaffold Tower

The İS-KA mobile scaffold tower is a modular working scaffold on castors, developed for maintenance, installation, painting and building services work at height. It is manufactured from steel in our factory in two versions: ringlock type (Ringscaff-M) and H frame type (Safescaff-M). Thanks to its braked castors, this rolling scaffold is moved to the next working position without dismantling and can be reused again and again on site or in a facility.

All modular components of the system are developed in accordance with EN 1004. Safe working platforms can be built up to 150 kg/m² for load class 2 and 200 kg/m² for load class 3. All components are hot-dip galvanized to EN ISO 1461, so the tower can be used for many years outdoors as well as indoors.

Technical specifications

  • Maximum height: 12.00 m indoors, 8.00 m outdoors
  • Platform width: ringlock type 0.70 / 1.05 / 1.345 m, H frame type 0.70 / 1.05 m
  • Platform capacity: max. 2.00 kN/m²
  • Castors: all braked, minimum 600 kg capacity per castor
  • Finish: hot-dip galvanized to EN ISO 1461
  • Tower and platform dimensions are designed for the working height

Main components

  • Base jacks and braked castors
  • Base collars
  • Standards (ringlock type) / frames (H frame type)
  • Ledgers
  • Steel decks
  • Guardrails and toe boards
  • Outriggers (stabilisers)
  • Diagonal braces

We test a sample from every production batch in our factory laboratory.

Look up scaffolding and formwork terms in our Glossary →

Why the İS-KA Mobile Tower?

Our Own Production

Ringlock and H frame components are manufactured on our own production line from TSE-certified steel tubes. Additional parts and spares are supplied quickly.

Braked Castors

All castors are braked and each carries at least 600 kg. The tower moves easily between working positions on suitable ground.

Up to 12 Metres

Frames and platform levels can be added up to 12 m indoors and 8 m outdoors; dimensions are designed for the job.

Three Width Options

Ringlock type with 2, 3 or 4 steel decks wide (0.70 / 1.05 / 1.345 m); suitable for narrow corridors up to large halls.

Galvanized Steel

Hot-dip galvanizing gives a long service life against humidity, rain and outdoor conditions.

Shared with Ringscaff

The ringlock mobile tower uses the same components as Ringscaff ringlock scaffolding and can be combined with parts already on site.

EN 1004 Compliant

Designed for platform loads of 150 kg/m² in load class 2 and 200 kg/m² in load class 3.

Product Manual

A product manual (in Turkish) describing erection, dismantling and safe use is available for both types.

Applications

  • Interior finishing: painting, plastering, drywall, suspended ceilings
  • Electrical, mechanical and HVAC installation
  • Maintenance of lighting, cameras and fire systems
  • Periodic maintenance in factories, warehouses and logistics centres
  • High-ceiling buildings such as malls, sports halls, exhibition and conference halls
  • Facade and outdoor repairs
  • Restoration of historic buildings

How to Choose the Right Mobile Tower

  • Working height: Determine the point to be reached; remember that platform height and working height are not the same.
  • Platform width: Choose a 2, 3 or 4-deck width according to the job, the equipment used and the space available.
  • Indoor / outdoor: The maximum height outdoors is 8 m; wind and ground conditions must also be assessed.
  • Ground: The ground under the castors must be level and load-bearing; on slopes, the tower is levelled with base jacks.
  • Load: The total load of people, materials and equipment on the platform must not exceed the value allowed for the load class.

Safe Use

  • Erection and dismantling must be carried out by trained personnel according to the product manual.
  • All castor brakes must be locked while working.
  • The tower must never be moved with people or materials on it.
  • Frames, braces, decks, guardrails, toe boards, castors and brakes must be checked before use.
  • Outriggers (stabilisers) must be used at the heights and positions given in the manual.
  • Stability is only ensured with components manufactured and certified by us; parts from other manufacturers must not be mixed in.

Frequently Asked Questions

What is the difference between ringlock and H frame mobile towers?

The ringlock type (Ringscaff-M) is built from standards and ledgers, has 3 width options and adapts more easily to different dimensions. The H frame type (Safescaff-M) is erected faster with ready-made frames and has 2 width options.

How high can a mobile scaffold tower be erected?

Our mobile towers can be erected up to 12.00 m indoors and 8.00 m outdoors. For taller towers or special layouts, please contact our technical team.

Which standard does it comply with?

The system complies with EN 1004; it is designed for platform loads of 150 kg/m² in load class 2 and 200 kg/m² in load class 3.

How much load do the castors carry?

All castors are braked and each has a load capacity of at least 600 kg.

Can it be used outdoors?

Yes. All components are hot-dip galvanized. The maximum height outdoors is 8.00 m; wind and ground conditions must be taken into account.

What material are your mobile scaffolds made of?

We manufacture our mobile scaffolds from galvanised steel; steel stands up to knocks on site and has a long service life.

Can I use it with my ringlock scaffolding components?

Yes. The ringlock mobile tower uses the same components as Ringscaff ringlock scaffolding.

Is rental available?

Our mobile scaffold towers are available for both sale and rental. Use the "Request a Quote for This Product" button to get an offer.

Can the tower be moved with people on it?

No. The platform must be cleared before moving, and all brakes must be locked once the tower is in its new position.