Lightform Panel - Detailed Information

Red Lightform column forms erected in a basement excavation on a narrow plot surrounded by neighbouring buildings, with a crew at work
Panel formwork that does not need a crane: panel weights and manual handling, pouring within the 40 kN/m² limit, column and wall erection, comparison with Maxiform, with sources.

Last updated:

01What Is Light Panel Formwork and What Does Lightform Change?

In wall and column formwork, the weight of the panel decides how work is organised on site. Heavy panels need a crane for every move; light panels can be carried into place by two people. Lightform is the light type in the panel formwork family we manufacture in our factory: it consists of a steel frame and a plywood face, is designed as standard for a fresh concrete pressure of 40 kN/m², and can be erected without a crane.

The price of lightness is the pressure it carries. The frame of the Maxiform panel in the same family is sized for 80 kN/m², and its largest panel is placed by crane. In Lightform the frame is kept lighter, so the largest panel, 100 × 300 cm, weighs 104.40 kg according to our catalogue. This page looks for the answers to two questions: what to watch for when carrying a light panel by hand, and how to plan a pour with a 40 kN/m² form.

40 kN/m²standard fresh concrete pressure
22.10-104.40 kgpanel weight, 15 sizes
50 / 75 / 100 cmpanel width
1.5 tlifting in sets when a crane is available

02Formwork on Sites Where There Is No Crane or Not Enough Crane

Not every site has a tower crane, and even where there is one, it cannot give all its hours to formwork. The places where a light panel pays off come from this situation:

  • Narrow plots and basements: On city plots excavated right up to the neighbouring buildings, setting up a crane is often difficult. Basement columns and walls can be formed by hand with panels lowered to the bottom of the excavation.
  • Foundations and low walls: For the sides of foundation beams, the first lift of retaining walls and walls up to 1.5 m, small panels go into place quickly.
  • Sites with limited crane capacity: While the crane is busy with reinforcement, the concrete skip and slab formwork, column and wall forming can progress independently of it.
  • Work inside the floors: In places the crane cannot reach or the operator cannot see, such as lift and stair walls, the panel is brought in and erected by hand.

The site in the cover photo shows this picture: in a basement excavation enclosed by apartment blocks, about ten column forms are standing at the same time, and the panels are carried and erected by hand on the excavation floor. When a crane arrives, the same panels can be joined with clamps and lifted as a set; we explain this in section 9.